Client: Chicago Department of Water Management
Location: Chicago, IL
Client: Chicago Department of Water Management
Location: Chicago, IL
The work included the installation of 655 linear feet of 36” internal diameter reinforced concrete pipe sewer; installation of 967 linear feet of 30” internal diameter reinforced concrete pipe sewer; installation of 1,277 linear feet of 24” internal diameter reinforced concrete pipe sewer; installation of manholes, catch basins and inlets; installation of connection structures; installation of temporary water main supports; construction of concrete collar connections, and installation of drain connections. This includes but is not limited to site mobilization, providing traffic control and protection for the duration of the contract; capping and or abandonment of existing water mains; removal and or abandonment of existing sewer; all required excavation, trenching, grading, backfilling and compaction of excavations; restoration of pavements, curbs, walkways, landscaped areas, and removal of all construction debris.
d’Escoto provided inspection services to verify the work and confirm proper adherence to all City standards and specifications. This included the installation of the earth retention system, excavation, installation of the sewer and sewer structures and proper backfilling of the excavation. Services also included inspection of the restoration work, measuring all work performed and submitting daily reports.