Client: Southern Company Gas / Nicor Gas

Location: Dupage County, IL

Description

As part of Nicor Gas’ efforts to increase operational reliability, flexibility, and meet forecasted load growth—Nicor replaced an existing 20″ x 0.281″ WT, 230# MOP line that was installed in 1956 with a new 24″ x 0.438″ WT, X65, 230# MOP line. d’Escoto provided various construction inspection services for the installation of the new pipeline. Additionally, d’Escoto supplied a full time Resident Engineer to oversee all excavations in the streets
The Elmhurst project involved the installation of approximately 3350 ft of 24” pipe. This project also included:
• One HDD RR tracks
• Several other conventional bores consisting of 24-inch
• Urban installation of most of the pipe under the resident streets.
• Having to coordinate installation with residents and supervise the restoration of the final pavement repair

Services Provided

d’Escoto inspected construction, installation, and commissioning activities performed by Nicor’s construction contractor throughout the Joliet Header project area.